
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Daguan-class troopshiplarger figure on 2 of 2
Stollergrund-class multi-purpose shiplarger figure on 0 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source196 metres (643 ft)[source]
Length
Single sourceConfiguration
| Specification | Daguan-class troopship | Stollergrund-class multi-purpose ship |
|---|---|---|
| Power | — | 1 × KHD SBV 6 M 628 diesel motor , 1 × shaft, 890 kW (1,190 hp)[source] |
| Operators | People's Liberation Army Navy[source] | German Navy Israeli Navy[source] |
| In service | 2011 - present[source] | — |
| Completed | ||
| Active | 2 |
38.92 m (127 ft 8 in)[source]
Unspecified
Single source8,000 nautical miles[source]Unspecified
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type | Troopship / Training ship / "Comprehensive support ship"[source] | Multi-purpose ship[source] |
|---|
| Capacity | 2,500 support personnel[source] | — |
|---|
| Aviation facilities | Medium helicopter deck[source] | — |
|---|
| Manufacturer | CSSC Offshore & Marine Engineering Company[source] | — |
|---|
| Aircraft carried | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion | — |
|---|
| Name | — | Stollergrund class[source] |
|---|
| Builders | — | Kröger-Werft Elsflether Werft[source] |
|---|
| Built | — | 1988–1990[source] |
|---|
| In commission | — | 1990–present[source] |
|---|
| Planned | — |
|---|