
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Daguan-class troopshiplarger figure on 2 of 2
Ropucha-class landing shiplarger figure on 0 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source196 metres (643 ft)[source]
Length
Single sourceConfiguration
| Specification | Daguan-class troopship | Ropucha-class landing ship |
|---|---|---|
| Operators | People's Liberation Army Navy[source] | Russian Navy Ukrainian Navy Yemeni Navy[source] |
| In service | 2011 - present[source] | — |
| Completed | 28[source] | |
| Active | Project 775: 8 Project 775M: 3[source] |
112.5 m (369 ft 1 in)[source]
Complement
Single source87–98[source]
2 × Zgoda-Sulzer 16ZVB40/48 diesel engines 3 ×
Single sourcediesel generators
Single source2 × 9,600 hp (7,200 kW) Zgoda-Sulzer 16ZVB40/48 diesel engines 3 × 750 kW (1,006 hp) diesel generators[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type | Troopship / Training ship / "Comprehensive support ship"[source] | Landing ship / tank landing ship[source] |
|---|
| Capacity | 2,500 support personnel[source] | 10 main battle tanks and 340 troops or 12 BTR and 340 troops or 3 main battle tanks, 3 2S9 Nona-S , 5 MT-LB , 4 army trucks and 313 troops or 500 tons of cargo[source] |
|---|
| Aviation facilities | Medium helicopter deck[source] | — |
|---|
| Manufacturer | CSSC Offshore & Marine Engineering Company[source] | — |
|---|
| Aircraft carried | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion | — |
|---|
| Name | — | Ropucha class[source] |
|---|
| Builders | — | Stocznia Północna Shipyard , Gdańsk , Poland[source] |
|---|
| Preceded by | — | Polnocny class[source] |
|---|
| Succeeded by | — | Ivan Gren class[source] |
|---|
| Subclasses | — | Project 775 (Ropucha I) Project 775M (Ropucha II)[source] |
|---|
| In commission | — | 1974[source] |
|---|
| Lost | — |
|---|
| Retired | — | 12[source] |
|---|
| Ramps | — | Bow and stern[source] |
|---|
| Propulsion | — | 2 × propellers[source] |
|---|
| Endurance | — | 30 days[source] |
|---|
| Armament | — | 2 × 57 mm AK-725 double guns (Ropucha I) 1 × 76 mm AK-176 (Ropucha II) 2 × 30 122 mm rocket launcher A-215 Grad-M Strela 2 (SA-N-5) surface-to-air missile system (4 launchers) 2 × 30 mm AK-630 six-barreled gatling guns (Ropucha II)[source] |
|---|
| Country of origin | — | Soviet Union[source] |
|---|
| Troop capacity | — | 10 main battle tanks and 340 troops or 12 BTR and 340 troops or 3 main battle tanks, 3 2S9 Nona-S , 5 MT-LB , 4 army trucks and 313 troops or 500 tons of cargo[source]Source-stated capacity; all configurations and qualifiers retained |
|---|