
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Daguan-class troopshiplarger figure on 2 of 2
Min Jiang-class minelayerlarger figure on 0 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source196 metres (643 ft)[source]
Length
Single sourceConfiguration
| Specification | Daguan-class troopship | Min Jiang-class minelayer |
|---|---|---|
| Operators | People's Liberation Army Navy[source] | Republic of China Navy[source] |
| In service | 2011 - present[source] | — |
| Completed | ||
| Active | ||
| Type |
41m[source]
Unspecified
Single source8,000 nautical miles[source]Unspecified
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Troopship / Training ship / "Comprehensive support ship"[source] |
Minelayer[source] |
| Capacity | 2,500 support personnel[source] | — |
|---|
| Aviation facilities | Medium helicopter deck[source] | — |
|---|
| Manufacturer | CSSC Offshore & Marine Engineering Company[source] | — |
|---|
| Aircraft carried | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion | — |
|---|
| Builders | — | Lung Teh Shipbuilding Co.[source] |
|---|
| Built | — | 2019-2021[source] |
|---|
| In commission | — | 2020-Present[source] |
|---|
| Planned | — | 10[source] |
|---|
| Armament | — | 1 x T-75 cannon , 2 x T74 machine gun[source] |
|---|