
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Daguan-class troopshiplarger figure on 1 of 1
Gorgona-class transport shiplarger figure on 0 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source196 metres (643 ft)[source]
LOA
Single sourceConfiguration
| Specification | Daguan-class troopship | Gorgona-class transport ship |
|---|---|---|
| Operators | People's Liberation Army Navy[source] | Italian Navy[source] |
| In service | 2011 - present[source] | — |
| Completed | ||
| Active | ||
56.72 m (186 ft 1 in) LOA[source]
full
Single source23,200–30,000 tonnes (22,800–29,500 long tons; 25,600–33,100 short tons) (full)[source]
/
Single sourceEmpty
Single sourcefull load
Single source- 631 t (621 long tons) / 799.6 t (787.0 long tons) full load - 460.27 t (453.00 long tons) empty[source]
of which 2 officers
Single source34 (of which 2 officers)[source]
2 x diesel engines Isotta Fraschini ID-36-8V each - 2 x diesel engines generators AIFO 8281-SRM-8V
Single sourceeach with Ansaldo electric engine MXR-315, 380V - 1 x diesel engine generator AIFO 8210-M6
Single sourcewith Ansaldo electric engine MXR-250, 380 V
Single source- 2 x diesel engines Isotta Fraschini ID-36-8V, 647 kW (868 bhp) each - 2 x diesel engines generators AIFO 8281-SRM-8V, 235 kW (315 bhp) each with Ansaldo electric engine MXR-315, 380V - 1 x diesel engine generator AIFO 8210-M6, 110 kW (150 bhp) with Ansaldo electric engine MXR-250, 380 V[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type |
|---|
Troopship / Training ship / "Comprehensive support ship"[source] |
Coastal Transport ship[source] |
| Capacity | 2,500 support personnel[source] | — |
|---|
| Aviation facilities | Medium helicopter deck[source] | — |
|---|
| Manufacturer | CSSC Offshore & Marine Engineering Company[source] | — |
|---|
| Aircraft carried | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion | — |
|---|
| Name | — | Gorgona[source] |
|---|
| Builders | — | Cantiere Navale Mario Morini , Ancona[source] |
|---|
| In commission | — | 1986-1987[source] |
|---|
| Planned | — |
|---|
| Propulsion | — | - 2 x shaft and thruster - 1 x Auxiliary bow thruster[source] |
|---|
| Sensors & processing systems | — | 2 x GEM Elettronica MM/SPN-753 navigation radar[source] |
|---|
| Country of origin | — | Italy[source] |
|---|