
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Chungmugong Yi Sun-sin-class destroyerlarger figure on 0 of 2
Daguan-class troopshiplarger figure on 2 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source150 m (492 ft 2 in)[source]
Length
Single sourceConfiguration
| Specification | Chungmugong Yi Sun-sin-class destroyer | Daguan-class troopship |
|---|---|---|
| Builders | Hyundai Heavy Industries Daewoo Shipbuilding & Marine Engineering[source] | — |
| Operators | Republic of Korea Navy[source] | People's Liberation Army Navy[source] |
| Preceded by | Gwanggaeto the Great class[source] | — |
| Succeeded by | Sejong the Great class[source] | — |
| Built | 2002-2006[source] |
196 metres (643 ft)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| In commission | 2003–[source] | — |
|---|
| Active |
|---|
| Type | Destroyer[source] | Troopship / Training ship / "Comprehensive support ship"[source] |
|---|
| Propulsion | Hanhwa GE LM2500, Doosan MTU 956 Combined diesel or gas[source] | — |
|---|
| Armament | 1 × 5 inch (127 mm)/L62 caliber Mk 45 Mod 4 naval gun 1 × 30 mm Goalkeeper CIWS 1 × RAM Block 1 CIWS 8 × SSM-700K Haeseong Anti-ship Missiles 32-cell Mk 41 VLS for SM-2 Block IIIA 24-cell K-VLS for: K-ASROC Red Shark Hyunmoo III land attack cruise missiles[source] | — |
|---|
| Aircraft carried | 2 × Super Lynx helicopters[source] | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion |
|---|
| Notes | Wang Geon is currently (April 2015) acting in a NEO / Temporary diplomatic mission role on station off the coast of Yemen . She was originally in the area as part of the Cheonghae Unit rotation.[source] | — |
|---|
| Country of origin | South Korea[source] South Korea[source] | — |
|---|
| In service | — | 2011 - present[source] |
|---|
| Completed | — |
|---|
| Capacity | — | 2,500 support personnel[source] |
|---|
| Aviation facilities | — | Medium helicopter deck[source] |
|---|
| Manufacturer | — | CSSC Offshore & Marine Engineering Company[source] |
|---|