
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Measured figures
~
Single sourceLength · source measurement 2
Single sourceConfiguration
| Specification | Choe Hyon-class destroyer | Daguan-class troopship |
|---|---|---|
| Builders | Nampo Shipyard Hambuk Shipyard[source] | — |
| Operators | Korean People's Navy[source] | People's Liberation Army Navy[source] |
| Built | 2024–present[source] | — |
| In commission | 2026–present[source] | — |
| Planned | — |
Length · source measurement 3
Single source~144–145 metres (472 ft 5 in – 475 ft 9 in)[source]
Length
Single source196 metres (643 ft)[source]
Maximum
Single source18 knots[source]Maximum
Unspecified
Single source8,000 nautical miles[source]Unspecified
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Building | — |
|---|
| Completed |
|---|
| Active |
|---|
| Type | Guided-missile destroyer[source] | Troopship / Training ship / "Comprehensive support ship"[source] |
|---|
| Sensors & processing systems | Phased array radars Type 362 air/surface search radar 3 × fire-control radars 2 × navigation radars Hull-mounted sonar IFF system[source] | — |
|---|
| Electronic warfare & decoys | 4 × countermeasures dispensers R-ESM R-ECM[source] | — |
|---|
| Armament | 1 × 127 mm (5.0 in) or 130 mm (5.1 in) naval gun 1 × Pantsir-ME CIWS 2 × 30? mm CIWS 8 x 1 14.5mm KPV heavy machine gun 88 × VLS cells of various sizes for guided missiles 4 × 4 anti-ship missile launchers 2 × 2 533 mm (21.0 in) DTA-53 torpedo launchers[source] | — |
|---|
| Aircraft carried | 1 × helicopter or UAV[source] | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion |
|---|
| Aviation facilities | Flight deck[source] | Medium helicopter deck[source] |
|---|
| Notes | References[source] | — |
|---|
| In service | — | 2011 - present[source] |
|---|
| Capacity | — | 2,500 support personnel[source] |
|---|
| Manufacturer | — | CSSC Offshore & Marine Engineering Company[source] |
|---|