ANaval support & landing craft
Loading the evidence…
Preparing your view.
Preparing your view.
ANaval support & landing craft
At a glance
Chinese replenishment ship Qinghaihularger figure on 1 of 1
Rigid Raiderlarger figure on 0 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source178.9 metres (587 ft)[source]
Length
Single sourceConfiguration
| Specification | Chinese replenishment ship Qinghaihu | Rigid Raider |
|---|---|---|
| Displacement | 37,594 tons (full load)[source] | — |
| Builders | Kherson Shipyard Dalian Shipbuilding Industry Company[source] | — |
| Operators | People's Liberation Army Navy[source] | — |
| Preceded by | Type 905 replenishment oiler[source] | — |
| Succeeded by | Type 903 replenishment ship[source] | — |
| In commission |
6.5 m (21 ft 4 in)[source]
Maximum; Speed
Single source16.4 knots (30.4 km/h; 18.9 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
1996-present[source] |
| — |
| Name | Qinghaihu[source] | — |
|---|
| Namesake | Qinghai Lake[source] | — |
|---|
| Laid down | January 1989[source] | — |
|---|
| Launched | April 1992[source] | — |
|---|
| Commissioned | 2 June 1996[source] | — |
|---|
| Identification | Hull number : 885[source] | — |
|---|
| Status | Active[source] | — |
|---|
| Class & type | Komandarm Fedko-class oiler[source] | — |
|---|
| Capacity | 9630 tons of fuel oil[source] | — |
|---|
| Aircraft carried | 1 x Harbin Z-8[source] | — |
|---|
| Aviation facilities | Hangar and flight deck[source] | — |
|---|
| Troops | — | 10 Royal Marines (2 crew, 8 fully equipped troops)[source] |
|---|
| Role | — | fast raiding and assault craft[source]Exact source equipment subject, not its payload or a supported platform |
|---|
| Country of origin | — | United Kingdom[source]Inventory Origin column; table 2, row 3, cell 2; revision 1373375989; retrieved 2026-09-30 |
|---|