ANaval support & landing craft
Loading the evidence…
Preparing your view.
Preparing your view.
ANaval support & landing craft
At a glance
Chinese hospital ship Daishan Daolarger figure on 1 of 1
Fabian Wrede-class training shiplarger figure on 0 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source178 m (584 ft 0 in)[source]
Length
Single sourceConfiguration
| Specification | Chinese hospital ship Daishan Dao | Fabian Wrede-class training ship |
|---|---|---|
| Complement | — | 10+2[source] |
| Power | — | 1 screw 500 kW /2200 RPM CAT C 18 engine[source] |
| Name | Daishan Dao (navy) ( Chinese : 岱山岛 ) Peace Ark (peacetime) ( Chinese : 和平方舟 )[source] | — |
| Namesake | Daishan Island[source] | — |
| Builder | CSIC (Guangzhou Shipyard International Company Limited)[source] | — |
| Launched | 2007 |
19.6 m (64 ft)[source]
Maximum; Speed
Single source10 knots (19 km/h)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Commissioned | December 22, 2008[source] | — |
|---|
| Home port | Zhoushan[source] | — |
|---|
| Status | in active service[source] | — |
|---|
| Class & type | Type 920 hospital ship[source] | — |
|---|
| Propulsion | twin engines[source] | — |
|---|
| Aircraft carried | Z-8JH helicopter (27 passengers or 15 stretchers)[source] | — |
|---|
| Aviation facilities | Hangar[source] | — |
|---|
| Builders | — | Uudenkaupungin työvene[source] |
|---|
| Operators | — | Finnish Navy[source] |
|---|
| Preceded by | — | Heikki class training ship[source] |
|---|
| In commission | — | 2006-[source] |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Type | — | Training ship[source] |
|---|
| Source measurement | — | Fabian Wrede class ships are built with steel hull and aluminium superstructure . One 500 kW CAT C 18 engine driving a single screw provides the propulsion for the vessels, with a bow thruster provided for increased maneuverability. An auxiliary 38 kVA diesel generator is also carried. The ships are manned with a maximum of eight seaman students and four instructors and crew members. Intended as purpose-built training ships, the internal layout and equipment of the bridge is designed similar to larger warships. The engine room is built spacious enough for several students and the mess can be converted to a class room.[source]Fabian Wrede-class training ship · Design; only the objects and conditions stated in this passage |
|---|