Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Chaland de transport de matériellarger figure on 0 of 5
Project 23131 replenishment oilerlarger figure on 5 of 5
Measured figures
Length
Single source23.8 m (78 ft 1 in)[source]
Length
Single sourceConfiguration
| Specification | Chaland de transport de matériel | Project 23131 replenishment oiler |
|---|---|---|
| Power | 2 × Poyaud-Wärtsilä 18V8M1 diesel engines , 331 kilowatts (444 hp) 2 propellers[source] | — |
| Operators | French Navy Djiboutian Navy Chilean Navy Ivory Coast Navy Royal Moroccan Navy Senegal Navy[source] | Russian Navy[source] |
| Completed | 31[source] | — |
| Active | 5 remaining with the French Navy as of 2023; others with other navies[source] | — |
| Retired | 11+[source] |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
145 m (476 ft)[source]
max
Single source150 tonnes (150 long tons ) (max)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Type | Landing craft[source] | Replenishment oiler[source] |
|---|
| Capacity | 90 t (89 long tons; 99 short tons)[source] | — |
|---|
| Troops | 200[source] | — |
|---|
| Armament | 2 × 12.7 mm (0.50 in) machine guns[source] | — |
|---|
| National origin | France[source] | — |
|---|
| Name | — | Project 23131[source] |
|---|
| Builders | — | Zaliv shipyard[source] |
|---|
| Built | — | 2014–present[source] |
|---|
| Building | — |
|---|
| Tonnage | — | 12,000 DWT[source] |
|---|
| Propulsion | — | 2 × diesels, 2 × fixed pitch propellers, 2 × bow thrusters[source] |
|---|
| Endurance | — | 60 days[source] |
|---|
| Country of origin | — | Ukraine, Russia[source] Ukraine[source] Russia[source] |
|---|