Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
BRP Tagbanualarger figure on 0 of 2
Project 22870 tugboat
Measured figures
Length
Single source51.43 m (168 ft 9 in)[source]
Length
Single sourceConfiguration
| Specification | BRP Tagbanua | Project 22870 tugboat |
|---|---|---|
| Power | — | 2 × KL6538-AS06 electric motors (2 × 2,720 PS or 2,680 shp ) 3 × 1,520 kW diesel generators 2 × 200 kW diesel generators 2 × 100 kW diesel generators 2 × Azipod units 2 × bow thrusters[source] |
| Name | Tagbanua[source] | Project 22870[source] |
| Namesake | Tagbanua tribe is one of the oldest tribes in the Philippines.[source] | — |
| Operator | Philippine Navy[source] | — |
| Builder | Philippine Iron Construction and Marine Works, Engine: Propmech[source] |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
57 m (187 ft 0 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Cost | ₱ 178.9 million (2011) per unit[source] | — |
|---|
| Launched | 28 September 2011[source] | — |
|---|
| Sponsored by | Mrs. Victoria Elisa "Viel" Aquino-Dee[source] | — |
|---|
| Acquired | November 2011[source] | — |
|---|
| Commissioned | 14 December 2011[source] | — |
|---|
| Maiden voyage | 10 November 2011[source] | — |
|---|
| Status | in active service[source] | — |
|---|
| Type | Landing Craft Utility[source] | Rescue tug[source] |
|---|
| Depth | 2.44 m (8 ft 0 in)[source] | — |
|---|
| Propulsion | Caterpillar CAT C32 ACERT Diesel Marine Engine[source] | — |
|---|
| Capacity | 110 tons cargo a 250 m 2 (2,700 sq ft) space, 200 passengers[source] | — |
|---|
| Sensors & processing systems | Sperry Marine Visionmaster FT navigation radar[source] | — |
|---|
| Armament | 6 × 50 cal. 12.7 mm machine guns[source] | — |
|---|
| Builders | — | Zvezdochka Shipyard , Astrakhan[source] |
|---|
| Operators | — | Russian Navy[source] |
|---|
| Built | — | 2011–present[source] |
|---|
| In commission | — | 2014–present[source] |
|---|
| Planned | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Lost | — |
|---|
| Endurance | — | 20 days[source] |
|---|
| Country of origin | — | Russia[source] Russia[source] |
|---|