Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Bharati-class interceptor boatlarger figure on 0 of 2
Constellation-class frigatelarger figure on 2 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source27.6 m (90 ft 7 in)[source]
Length
Single sourceConfiguration
| Specification | Bharati-class interceptor boat | Constellation-class frigate |
|---|---|---|
| Complement | 1 officer and 12 enlisted[source] | 24 officers and 176 enlisted crew[source] |
| Power | 2 × Caterpillar MTU Friedrichshafen Gmbh 1630KW engines 2 × 69 kW 415 V 50 Hz AC[source] | CODLAG 1 × General Electric LM2500+G4 gas turbine 2 × electric propulsion motors: INDAR 2 x 3.4 MW 4 × ship service diesel generators Rolls-Royce MTU 20V 4000 M53B engine 3000 kW for a total output of 12 MW Reduction gears by Philadelphia Gears 2 x fixed-pitch propellers 1 × auxiliary propulsion unit Thrustmasters of Texas Hydrologic Retractable Thruster[source] |
| Name | Bharati-class interceptor craft[source] | Constellation class[source] |
496 ft (151.18 m)[source]
at 16 kn (30 km/h; 18 mph), electric drive
Single source6,000 nmi (11,000 km; 6,900 mi) at 16 kn (30 km/h; 18 mph), electric drive[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Builders |
|---|
Bharati Shipyard[source] |
Fincantieri Marinette Marine[source] |
| Operators | Indian Coast Guard[source] | United States Navy (projected)[source] |
|---|
| Preceded by | AMPL-class interceptor boat[source] | Freedom and Independence classes Oliver Hazard Perry class (last class with FFG hull code )[source] |
|---|
| Built | 2009–present[source] | 2024–present[source] |
|---|
| In commission | 2013–present[source] | 2029 (planned)[source] |
|---|
| Planned | 15[source] | 20[source] |
|---|
| Building |
|---|
| Completed |
|---|
| Active |
|---|
| Type | Interceptor boat[source] | Guided-missile frigate[source] |
|---|
| Depth | 3.1 m (10 ft 2 in)[source] | — |
|---|
| Succeeded by | — | FF(X)[source] |
|---|
| Cost | — | US$ 1.28 billion for the first ship US$1.05 billion for the second ship[source] |
|---|
| On order | — |
|---|
| Cancelled | — | 18[source] |
|---|
| Boats & landing craft carried | — | 2 × rigid-hulled inflatable boats[source] |
|---|
| Capacity | — | 200 accommodations[source] |
|---|
| Sensors & processing systems | — | Aegis Baseline 10 Combat System AN/SPY-6 (V)3 Enterprise Air Surveillance Radar (EASR) AN/SPS-73(V)18 - Next Generation Surface Search Radar Thales Group CAPTAS-4 Low Frequency Variable-Depth Sonar TB-37 Multi-Function Towed Array AN/SQQ-89(V)16 undersea warfare/anti-submarine warfare combat system Cooperative Engagement Capability[source] |
|---|
| Electronic warfare & decoys | — | AN/SLQ-32(V)6 electronic warfare suite 4 × Mark 53 Nulka decoy launching system AN/SLQ-61 Lightweight Tow Torpedo Defense Mission Module[source] |
|---|
| Armament | — | 32 Mark 41 VLS cells with: BGM-109 Tomahawk Cruise Missile Possibly RIM-162 ESSM Block 2 and/or RIM-174 Standard ERAM missiles Planned RIM-66 Standard SM-2 Block 3C 16 × canister-launched over-the-horizon anti-ship weapons (likely Naval Strike Missile ) RIM-116 Rolling Airframe Missile launched from Mk 49 Guided Missile Launching System (21 cell) Mk 110 57 mm gun with the Advanced Low Cost Munition Ordnance (ALaMO) projectile and related systems Various machine guns M240 or M2[source] |
|---|
| Aircraft carried | — | 1 × MH-60R Seahawk helicopter[source] |
|---|
| Aviation facilities | — | extra-large hangar for helicopter RAST Secure & Traverse Aircraft Handling System Horizontal Reference System Night Vision Device Compatibility[source] |
|---|
| Source measurement | — | The U.S. Navy contracted for the first FFG 62 in FY2020. The second ship contract was awarded in April 2021, and the third in FY22. The U.S. Navy's proposed FY2020 budget request was $1.281-billion for the procurement of the first FFG 62. The U.S. Navy's FY2020 budget submission shows that subsequent ships in the class were estimated by the Navy to cost $850 to $950-million each in then-year dollars.[source]Constellation-class frigate · Development; only the objects and conditions stated in this passage |
|---|