
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Assault Amphibious Vehiclelarger figure on 0 of 1
Namerlarger figure on 1 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Configuration
| Specification | Assault Amphibious Vehicle | Namer |
|---|---|---|
| Type | Amphibious armored personnel carrier[source] | Heavy armoured personnel carrier[source] |
| Place of origin | United States[source] | Israel[source] |
| In service | 1972–2025 (United States Marine Corps)[source] | 2008–present[source] |
| Used by | See Operators[source] | Israel Defense Forces[source] |
| Wars | Falklands War Lebanese Civil War Invasion of Grenada Persian Gulf War Somali Civil War Iraq War 2025 Cambodia–Thailand conflict[source] | Gaza War (2008–2009) Operation Protective Edge Gaza war 2026 Lebanon War[source] |
| Designer | FMC Corporation[source] | Israel Military Industries[source] |
| Designed | 1964–1969[source] | — |
| Manufacturer | United Defense (until 2005) BAE Systems Platforms & Services (from 2005)[source] | IDF Ordnance (assembler)[source] |
| Produced | 1972–present[source] | 2008–present[source] |
| Armor | 45 mm (1.8 in)[source] | Classified composite matrix of laminated ceramic – steel – nickel alloy + underlaid reactive armour . Sloped modular design.[source] |
| Main armament | Mk 19 40 mm automatic grenade launcher (rounds: 96 ready; 768 stowed) and 12.7 mm M2HB heavy machine gun (rounds: 200 ready; 1,000 stowed)[source] | Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher[source] |
| Suspension | torsion-bar-in-tube (AAV7A1); torsion bar (AAV7A1 RAM-RS)[source] | Helical spring[source] |
| Reported occupants | 24名[source]Assault Amphibious Vehicle · Total occupants; operating crew and transported personnel not distinguished in this sourceSource text · numeric interpretation needs review | — |
| Unit cost | — | $5 million[source] |
| No. built | — | Up to 290 are currently operational 531 in total planned to be produced by 2027[source] |
| Secondary armament | — | 1 × 7.62 mm (0.300 in) FN MAG MG 1 × 60 mm (2.4 in) external mortar 12 × smoke grenades[source] |
| Power/weight | — | 20 hp/tonne (15 kW/tonne)[source] |
| Payload capacity | — | 9 infantrymen[source] |
| Reported operators |
|
|