
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Antasena-class combat boatlarger figure on 1 of 2
Daguan-class troopshiplarger figure on 1 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
overall
Single source18.75 m (61.5 ft) overall[source]
Length
Single sourceConfiguration
| Specification | Antasena-class combat boat | Daguan-class troopship |
|---|---|---|
| Power | 2 × MTU V12 2000M86 1700 hp engine; 2 × MJP550 waterjet[source] | — |
| Builders | North Sea Boats[source] | — |
| Cost | €10 million–€15 million (November 2016) or US$12.25 million–US$19.23 million (January 2021)[source] | — |
| In commission | 2021–present[source] | — |
| Completed |
196 metres (643 ft)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type | Catamaran -type combat boat[source] | Troopship / Training ship / "Comprehensive support ship"[source] |
|---|
| Ramps | 1 × Forward landing ramp[source] | — |
|---|
| Boats & landing craft carried | 1 × RHIB (optional), 1 × Jet Ski (optional)[source] | — |
|---|
| Troops | 20–60 special forces or marines[source] | — |
|---|
| Armament | Cockerill 3000 series turret 1 × high-pressure low recoil-force 105 mm gun 1 × 30 mm cannon Cockerill Falarick 105 Gun Launched Anti-Tank Guided Missile (GLATGM) Lemur RWS mounting 12.7 mm HMG to 30 mm autocannon on top of the turret 2 × 12.7 mm heavy machine gun[source] | — |
|---|
| Armour | NATO Stanag 4569 Ballistic armor/armor plating covering the whole outside part of bridge/control room.[source] | — |
|---|
| Aircraft carried | 1 × North Sea Drones 6Y six-rotor VTOL drone (optional)[source] | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion |
|---|
| Notes | References[source] | — |
|---|
| Country of origin | Indonesia[source] | — |
|---|
| Operators | — | People's Liberation Army Navy[source] |
|---|
| In service | — | 2011 - present[source] |
|---|
| Active | — |
|---|
| Capacity | — | 2,500 support personnel[source] |
|---|
| Aviation facilities | — | Medium helicopter deck[source] |
|---|
| Manufacturer | — | CSSC Offshore & Marine Engineering Company[source] |
|---|
| Reported operators |
| — |
|---|