
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
AMZ Dziklarger figure on 2 of 3
Namerlarger figure on 1 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Configuration
| Specification | AMZ Dzik | Namer |
|---|---|---|
| Type | Infantry mobility vehicle[source] | Heavy armoured personnel carrier[source] |
| Place of origin | Poland[source] | Israel[source] |
| In service | 2004 - Present[source] | 2008–present[source] |
| Used by | Iraq Poland Lithuania Ukraine[source] | Israel Defense Forces[source] |
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Produced | 2004[source] | 2008–present[source] |
|---|
| Armor | Mostly B6 class armour; engine B4 armored[source] | Classified composite matrix of laminated ceramic – steel – nickel alloy + underlaid reactive armour . Sloped modular design.[source] |
|---|
| Main armament | PK machine gun using 7.62×51mm NATO[source] | Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher[source] |
|---|
| Secondary armament | As an alternative NSV using 12.7×108mm or 12.7×99mm NATO[source] | 1 × 7.62 mm (0.300 in) FN MAG MG 1 × 60 mm (2.4 in) external mortar 12 × smoke grenades[source] |
|---|
| Power/weight | 32 horsepower per tonne (24 kW/t)[source] | 20 hp/tonne (15 kW/tonne)[source] |
|---|
| Suspension | SM62[source] | Helical spring[source] |
|---|
| Manufacturer | AMZ[source] | IDF Ordnance (assembler)[source] |
|---|
| Wars | — | Gaza War (2008–2009) Operation Protective Edge Gaza war 2026 Lebanon War[source] |
|---|
| Designer | — | Israel Military Industries[source] |
|---|
| Unit cost | — | $5 million[source] |
|---|
| No. built | — | Up to 290 are currently operational 531 in total planned to be produced by 2027[source] |
|---|
| Payload capacity | — | 9 infantrymen[source] |
|---|
| Reported operators |
|
|
|---|