Loading the evidence…
Preparing your view.
Preparing your view.

Measured figures
Configuration
| Specification | Ambika-class replenishment ship | Hendijan-class vessel |
|---|---|---|
| Complement | — | 15+90 scientists[source] |
| Power | — | Diesel[source] 2 × Mitsubishi S16MPTK engines, 6,600 horsepower (4.9 MW) 2 × shafts[source] |
| Name | Ambika class[source] | — |
| Builders | Hindustan Shipyard Limited[source] | K Damen, Boven-Hardinxveld, Netherlands Marine Industries Organization, Iran[source] |
| Operators |
Beam
Single source8.55 m (28 ft 1 in)[source]
Maximum; Speed
Single source25 knots (46 km/h)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Indian Navy[source] |
Islamic Republic of Iran Navy[source] |
| Planned | — |
|---|
| Completed | 12[source] |
|---|
| Active | 11[source] |
|---|
| Laid down | 9 January 1993[source] | — |
|---|
| Launched | 12 October 1994[source] | — |
|---|
| Commissioned | 23 January 1995[source] | — |
|---|
| Type | High sulphur diesel oiler[source] | Auxiliary ship[source] |
|---|
| Built | — | 1988–1991[source] |
|---|
| Lost | — |
|---|