
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Akar-class replenishment oilerlarger figure on 6 of 6
Project 22870 tugboatlarger figure on 0 of 6
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
at 14 knots (26 km/h; 16 mph)
Single source6,000 nmi (11,000 km; 6,900 mi) at 14 knots (26 km/h; 16 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Configuration
| Specification | Akar-class replenishment oiler | Project 22870 tugboat |
|---|---|---|
| Power | 4,847 kW (6,500 hp) diesel engine, one shaft.[source] | 2 × KL6538-AS06 electric motors (2 × 2,720 PS or 2,680 shp ) 3 × 1,520 kW diesel generators 2 × 200 kW diesel generators 2 × 100 kW diesel generators 2 × Azipod units 2 × bow thrusters[source] |
| Name | Akar[source] | Project 22870[source] |
| Operators | Turkish Navy[source] | Russian Navy[source] |
| Built | 1987–1995[source] | 2011–present[source] |
| Completed | ||
| Active | ||
| Type | Replenishment oiler[source] | Rescue tug[source] |
| Sensors & processing systems | AN/SPG-34 fire-control radar[source] | — |
| Armament | 2 Bofors 40 mm L/70 guns 1 Mk 15 Phalanx CIWS[source] | — |
| Aviation facilities | Aft helicopter pad[source] | — |
| Country of origin | Turkey[source]Akar class · explicit construction country for both ships; not inferred from operating navy or yard address | Russia[source] |
| Manufacturer | Gölcük Naval Shipyard[source]Akar class · Akar built byGölcükNavalShipyard; YarbayKudretGüngör built bySedefShipyard; separate named class members Sedef Shipyard[source]Akar class · Akar built byGölcükNavalShipyard; YarbayKudretGüngör built bySedefShipyard; separate named class members Gölcük Naval Shipyard[source]Akar class · Akar A-580 original construction Sedef Shipyard[source]Akar class · Yarbay Kudret Güngör A-595 original construction | — |
| Builders | — | Zvezdochka Shipyard , Astrakhan[source] |
| In commission | — | 2014–present[source] |
| Planned | — | |
| Lost | — | |
| Endurance | — | 20 days[source] |