Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Adamya-class patrol vessellarger figure on 3 of 3
Measured figures
Length
Single source51.43 m (168 ft 9 in)[source]
Length
Single sourceConfiguration
| Specification | Adamya-class patrol vessel | MNS Pebane |
|---|---|---|
| Complement | 5 officers and 34 personnel[source] | — |
| Range | 1500 nm at cruising speed with 25% reserve fuel capacity[source] | — |
| Power | 2 × 3,000 kW (4,000 hp) diesel engines 2 × Controllable pitch propellers[source] | — |
| Builders | Goa Shipyard Limited , Goa , India[source] | — |
| Operators | Indian Coast Guard Seychelles Coast Guard[source] | — |
| Preceded by | Aadesh class |
MNS Pebanelarger figure on 0 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
32.2 m (105 ft 8 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Succeeded by | MDL class[source] | — |
|---|
| Built | 2023 – present[source] | — |
|---|
| In commission | 2025 – present[source] | — |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Type | Fast patrol vessel[source] | — |
|---|
| Endurance | 5 days[source] | — |
|---|
| Armament | 1 × CRN 91 Naval Gun 2 × OFT 12.7 mm M2 Stabilized Remote Controlled Gun[source] | — |
|---|
| Name | — | Pebane[source] |
|---|
| Laid down | — | 1981[source] |
|---|
| Acquired | — | 2013 from Spain[source] |
|---|
| Commissioned | — | 2013[source] |
|---|
| Role | — | patrol ship[source]Exact source equipment subject, not its payload or a supported platform |
|---|