Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Abu Mahdi al Muhandis-class corvettelarger figure on 1 of 3
ENS Tahya Misrlarger figure on 2 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source48.0 m (157 ft 6 in)[source]
Length
Single sourceConfiguration
| Specification | Abu Mahdi al Muhandis-class corvette | ENS Tahya Misr |
|---|---|---|
| Power | Diesel engine[source] | MTU Series 4000 (2,2 MW everyone) CODLOG[source] |
| Builders | Shahid Mahallati Shipyard, Bushehr[source] | — |
| Operators | Islamic Republic of Iran Navy[source] | — |
| Built | 2021–present[source] | — |
| In commission | 2023–present[source] |
466 ft (142.0 m)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Planned | — |
|---|
| On order | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Lost | — |
|---|
| Type | Missile corvette[source] | — |
|---|
| Propulsion | 4 × engines[source] | — |
|---|
| Endurance | 14 days[source] | — |
|---|
| Sensors & processing systems | Radars and latest electronics[source] | Héraklès multi-purpose passive electronically scanned array radar[source] |
|---|
| Electronic warfare & decoys | Unknown EW 2 × Chaff dispensers[source] | — |
|---|
| Armament | 1 × 30 mm auto-canon 2A42 4 × 20 mm gatling guns (3 barrelled) 6 × Anti-ship cruise missiles 8 × surface to air missiles Kosar[source] | 16-cell MBDA SYLVER A43 VLS for 16 MBDA Aster 15 missiles 1 × Leonardo OTO Melara 76 mm SR gun 3 × Nexter 20 mm Narwhal remote weapon systems 8 × MBDA MM40 Exocet block 3 anti-ship missiles 2 x double Leonardo (WASS) B-515 launcher for MU 90 torpedoes[source] |
|---|
| Aircraft carried | VTOL drones[source] | 1 × NH90 helicopter[source] |
|---|
| Country of origin | Iran[source] | — |
|---|
| Name | — | Tahya Misr (تحيا مصر)[source] |
|---|
| Namesake | — | Tahya Misr (Long live Egypt)[source] |
|---|
| Ordered | — | 16 February 2015[source] |
|---|
| Builder | — | DCNS , Lorient[source] |
|---|
| Laid down | — | 8 October 2008[source] |
|---|
| Launched | — | 18 October 2012[source] |
|---|
| Commissioned | — | 17 March 2016[source] |
|---|
| Renamed | — | From Normandie[source] |
|---|
| Home port | — | Alexandria[source] |
|---|
| Identification | — | MMSI number : 622121039 Callsign : SSMQ Hull number : FFG 1001[source] |
|---|
| Status | — | Active[source] |
|---|
| Class & type | — | Aquitaine -class frigate[source] |
|---|
| Aviation facilities | — | Single hangar[source] |
|---|
| Source measurement | — | On 16 February 2015, the Egyptian Navy ordered one FREMM vessel to enter service before the opening of the New Suez Canal , as part of a larger deal (including 24 Rafales and a supply of missiles) worth US$5.9 billion (€5.2 billion). The SYLVER A70 VLS and NETTUNO-4100 jamming equipment were removed due to export limitations for such sensitive equipment. The crew will be around 126 sailors compared to 108 in the French Navy. The SATCOM antenna for the French Syracuse satellites was also taken down; however, Egypt will use its own military telecommunications satellite, supplied by Airbus Defence and Space and Thales Alenia Space , in conjunction with its naval vessels. From March 2015, DCNS trained the Egyptian crew in the technology of the ship and DCNS and its partners accompanied the crew for a period of 15 months.[source]ENS Tahya Misr · Development and design; only the objects and conditions stated in this passage |
|---|